
Conditions & Services: KLM performed a floatdown evaluation of Tower Number 1. KLM worked with the Utilities Supervisor on the project to provide plans and specifications. A qualified contractor was selected to perform the reconditioning of the tower. A full containment system was utilized during the project. KLM provided construction management, full time AWS, NACE inspectors, and antenna management throughout the project. A new logo was painted on two sides of the tower; choosing Tnemec Hydroflon for the topcoat on the exterior of the tower. The tower can be seen from Hwy 35W & 23.